How to execute test with 2 iqInterfaces

How to execute test with 2 iqInterfaces

For a test purpose it is possible to run Test communication between 2 iqInterfaces (option “EMC” should be available on both)

Configure Master tester as described in IO-Link Master as DUT

Configure second iqInterface as DUT -> select tab “Setup iqMaster for Test” -> Start test (press the button “Start test”). The communication should be established and counters should be running

 